The contract covering ILWU Local 26 watchmen at the ports of Los Angeles and Long Beach now runs through Friday, November 20. The strike deadline has been extended three times from the original November 1 date, and no replacement agreement or further extension has been announced.
According to the Pacific Maritime Association (PMA), Local 26 watchmen work at terminals handling about 85% of Long Beach cargo and 33% of Los Angeles cargo. That share measures cargo through those terminals. How much would actually be held depends on whether a strike starts and how long it lasts. For an importer, the practical question is which terminal holds each container and whether it can leave before Friday. A port-level arrival status can’t answer that.
Our October 29 guide to preparing for D&D disputes covers the records and billing rules. This update covers what has changed since the November 1 deadline and how to sort open containers before Friday.
What Expires on November 20
Local 26 represents about 250 watchmen, roughly 2% of the ILWU workforce at the two ports. Their previous agreement expired in July 2025, and they have kept working under extensions while PMA and the union negotiate with help from federal mediators. Members authorized a strike after more than a year of bargaining.
This dispute is separate from the coastwide longshore contract covering about 22,000 workers at 29 West Coast ports, which runs through 2028.
| Deadline | Outcome |
|---|---|
| Sun, Nov 1, 5 p.m. PT | Extended Oct 30 |
| Wed, Nov 4, 5 p.m. PT | Extended Nov 4 |
| Fri, Nov 6, midnight PT (end of Friday) | Extended Nov 6 |
| Fri, Nov 20 | Current deadline; hour not specified |
Earlier extensions ended at 5 p.m. Pacific or at midnight at the end of Friday. PMA’s November 6 statement extends the contract “through Nov. 20” without an hour. Plan around Friday and confirm timing with your carrier or terminal.
Six Container Terminals on an Eight-Location Notice
The union’s strike notice to other maritime unions lists eight locations. Reporting by Sourcing Journal, cited by SupplyChainBrain, sorts them into six container terminals and two non-container facilities, which matches PMA’s count of six container terminals. PMA has not published its own named list.
| Container terminals | Non-container facilities |
|---|---|
| APM Terminals (Pier 400) | SSA Marine, LB 206 |
| Long Beach Container Terminal (LBCT) | SSA Marine, Outer Harbor Berth 55 (OH 55) |
| Total Terminals International (TTI) | |
| SSA Marine, Berth C-60 | |
| SSA Marine, Berth A-90 | |
| Pacific Container Terminal (PCT) |
For container importers, that narrows the check to the six terminals in the left column, which this post calls listed terminals. Confirm the actual terminal and gate for each container with the carrier, terminal or trucker, especially when the arrival notice uses a different name.
Watchmen control and inspect truck and employee entries at terminal gates and guard cargo moving across the docks. The bigger risk is the picket line. PMA expects other ILWU members to honor it, and gCaptain reported on November 12 that longshore workers in Local 13 and marine clerks in Local 63 had indicated they would. If they do, vessel loading and unloading, container-yard activity and truck-gate operations could stop at the listed terminals.
Why the Port Name Is Not Enough
Two containers arriving at Long Beach the same week can face very different outcomes. One discharges at a terminal off the list and leaves on a truck. The other sits at a listed terminal waiting for a train. Tracking that stops at “arrived at Long Beach” puts both in the same bucket.
The existing rail backlog makes the second case worth checking. In gCaptain’s November 12 report, about 9,500 rail-bound import containers at Los Angeles and 5,063 at Long Beach had waited nine days or longer. These counts cover each port as a whole. They still show how many discharged containers remain inside terminals well after arrival.
The National Retail Federation’s Jonathan Gold said on November 9 that most holiday merchandise is already here, and that West Coast cargo has sat for extended periods waiting for rail cars. Arrival in the country and departure from the terminal are separate events on a container’s timeline, and a terminal work stoppage could interrupt the second.
If you’re checking terminal assignments and last free days carrier by carrier, see how teams consolidate container updates from 100+ carriers in one view.

Sort Open Containers Before Friday
Discharged and waiting for truck pickup
Pull every LA/Long Beach container that is available but not yet collected, and flag those at listed terminals. Check each one’s last free day against Friday. Two groups need attention: containers already near or past their last free day, and containers whose free time runs into next week, which a stoppage would catch partway through. Book feasible truck appointments now, since a rush to clear the same terminals before Friday will tighten capacity.
Waiting for on-dock rail
PMA’s statements don’t say whether on-dock rail loading would continue at a picketed terminal. Treat rail-bound containers at listed terminals as exposed until the carrier or terminal confirms otherwise. For high-priority cargo, ask whether a switch to truck delivery is operationally possible and compare its full cost with a multi-day delay.
Still on the water
For vessels due on or after November 20, confirm the discharge terminal now. If it’s a listed terminal, ask the carrier whether an alternative discharge arrangement is under consideration and how it would change inland transport. A diversion may not be available for an individual shipment. Recheck ETAs and terminal assignments daily this week, since a schedule change can move a call into the window.
Empties due back next week
A closure of the designated return gate could also prevent empty returns. For empties due back on or after November 20, confirm the designated return location and any authorized alternative with the carrier in writing. Record when equipment free time ended and any failed return attempts.
What’s New on D&D Since Our October 29 Guide
The October 29 guide still applies for what to record, what a compliant D&D invoice must show and how the FMC’s billing deadlines work. Two points to add.
California law. California Business and Professions Code Section 22928 bars marine terminal operators and container providers from starting or continuing free time, or imposing per diem, detention or demurrage, on a motor carrier, beneficial cargo owner or other intermediary in specified circumstances, including when the terminal truck gate is closed during posted working hours. How it applies depends on the facts and the invoice.
Forwarder invoices. If your D&D bill comes from a forwarder acting as an NVOCC, its 30-day invoice deadline runs from the date of the invoice it received from the carrier or terminal. Our post on disputing D&D charges from your freight forwarder walks through that case.
If the Deadline Moves Again
Each of the last three deadlines ended in an extension, and the latest bought two weeks. Another would postpone the risk without settling the contract. Keep the list of containers at listed terminals current, and add each new arrival until the parties confirm an agreement or another extension.
What to Check Before November 20
- The actual terminal for each open LA/Long Beach container, checked against the six listed container terminals
- The last free day and a feasible pickup appointment for each available container at a listed terminal
- Rail-bound containers at listed terminals, and the carrier’s plan if rail loading stops
- Vessels due on or after November 20, their discharge terminal and any carrier-confirmed alternative
- Return locations for empties due back next week
- Written D&D and storage guidance, plus timestamped records for each affected container
- New statements from PMA, the union, carriers and terminals
Frequently Asked Questions
Does the November 20 deadline affect other West Coast ports?
The dispute covers Local 26 watchmen at Los Angeles and Long Beach. The coastwide contract for about 22,000 longshore workers at 29 West Coast ports is separate and runs through 2028.
Would dockworkers stop work too?
PMA expects other ILWU members to honor Local 26 picket lines, and gCaptain reported on November 12 that Locals 13 and 63 had indicated they would. A wider stoppage could follow if a strike starts and other ILWU workers honor the picket lines.
What time on November 20 does the extension end?
PMA’s November 6 statement did not specify an hour. Earlier extensions ended at 5 p.m. Pacific and at midnight, but neither sets the time for this deadline.
Further Reading
- Statement on ILWU Local 26 Negotiations, November 6, Pacific Maritime Association
- Port of Los Angeles strike threat deferred to Nov. 20, Transport Topics
- Strike at busiest US port just days away as talks continue, FreightWaves
- Port strike delayed again at Los Angeles, Long Beach ports, FreightWaves
- Employers, Watchmen at California Ports Extend Contract Talks, Reuters via Insurance Journal
- Ports of LA & Long Beach Face Loading Delays, Looming Strike, SupplyChainBrain
- Port of Los Angeles Sets October Cargo Record as Strike Threat and Rail Delays Loom, gCaptain
- Import Cargo Still Strong as Peak Season Winds Down, National Retail Federation
- California Business and Professions Code Section 22928, Justia
- 46 CFR 541.7: Timing of demurrage or detention invoices, Legal Information Institute
Status as of November 16, 2026. Contract deadlines, the 250-watchmen count and the 85% Long Beach / 33% Los Angeles terminal shares are from PMA statements, also reported by FreightWaves, Transport Topics and Reuters. The six-container, two-non-container classification is from SupplyChainBrain, October 29, citing Sourcing Journal. Rail wait figures and the Local 13 and Local 63 positions are from gCaptain, November 12. The holiday-cargo comment is from NRF, November 9. D&D references are to California Business and Professions Code Section 22928 and 46 CFR 541.7. Confirm terminal assignments, free time, charge relief and return instructions with your carrier, terminal and contract. This article is general operational information, not legal advice.
Need help interpreting this disruption or your shipment?
For a quick question, chat with Tradlinx on WhatsApp. For a deeper discussion, book a time below.




Leave a Reply